Several possible master plans have been developed for the AMS campus. Each responds to the needs identified on the campus, but options have been provided to identify different ways to address those needs. For each campus there are options that propose minimal modifications and more substantial modifications. Minimal modifications will, generally, be less expensive than major modifications. The eventual masterplan may be a combination of the various options from the various plans or a new option based on feedback.

Click through the tabs below to take a look at the options and then provide your feedback through the survey beneath. Let us know: What is a positive (pro) about the option? What is a negative (con) about the option? What other questions or comments do you have?

As you review, remember that none of these plans are final. Any final master plan must take into account facilities upgrades across the entire District because proposed changes to one campus often impact other campuses.

You can also download a pdf of the master plan options and presentation here.

AMS Option 1

Option 1 for the AMS campus includes the following modernizations:

  • New warming kitchen and servery
  • Renovate and expand lunch shelter
  • New all-gender locker room with direct access to gymnasium
  • Major modernization of admin area
  • Major modernization of restrooms in Areas B/C
  • Minor modernization of gymnasium and classroom building
  • Address exterior envelop & HVAC issues with stucco and water intrusion
  • Renovation of existing classroom into science lab
  • Remove Caretaker's Cottage & improve access to Cougar Field from campus & Spokane Ave
  • Remove existing shade structures
  • Site improvements to campus (lighting, paving, & fencing, especially along Ohlone Greenway)

Plan of AMS showing proposed minor modifications of most buildings, with major modifications done to the office and cafeteria

AMS Option 1. First Floor of buildings on main campus

AMS main building 2nd floor master plan showing minor modernizations to building throughout

AMS Option 1. Second floor

AMS Option 2

Option 2 for the AMS campus includes the modernizations described in Option 1 plus:

  • New central/scratch cooking kitchen and servery, which helps relieve space issues at AHS

Plan of AMS showing proposed minor modifications of most buildings, with major modifications done to the office and cafeteria

AMS Option 2. First Floor of main building and adjacent campus

Plan of AMS showing 2nd floor proposed minor modifications of most buildings, with major modifications done to the office and cafeteria

AMS Option 2. Second Floor

AMS Fields and Outbuildings

Proposed improvements to AMS fields and outbuildings includes:

  • Ongoing maintenance & improvements to stadium
  • Ongoing improvements to baseball field, including batting cages
  • Install all-weather turf at softball field & portion of practice field (optional installation at baseball field)

Plan of fields and outbuildings showing proposed proposed improvements to fields and stadium

AMS Fields and Outbuildings.

AMS Annex

Options AMS annex include the following modernizations:

  • District SPED office renovated to an AMS classroom
  • District admin space renovated to AMS admin
  • Improvement of street crossing between annex & main campus
  • Exterior space & site improvements

Plan of AMS annex showing proposed modifications to first floor.

AMS Annex. First Floor

Plan of AMS showing proposed modifications to second floor

AMS Annex. Second Floor